Back to Housing Projects
In 1396 AH royal orders were issued to establish urgent public housing projects, with the aim of providing the greatest number of dwellings for those who needed them as quickly as possible. However, when those projects were completed, the dwellings remained empty for more than twenty years. It seems that the bodies concerned at the time did not draw up a distribution plan that took into account the circumstances of those in need, the levels of their need and their geographical distribution. The problem persisted for a long time until relief came a few years ago, and they were distributed in ways no one had anticipated, but which solved many problems and provided reasonable housing for many families in many cities.
Today we are about to see new housing projects, and we hope the Ministry of Housing will make them proportionate to the growing popular need for them. But several conditions are needed to complete the set. First, that the negatives of the previous experience not be repeated, not only in distribution but in design, floor areas, provision of services, and the planning of streets and facilities such as schools, mosques, markets and the like. In addition, those in need of these dwellings are waiting on tenterhooks and expect them to be finished as soon as possible; but this does not mean trying to finish these projects without regard to the other important aspects as well. True, the previous housing projects have some advantages and many positive features, but we cannot deny some negatives, even though the specifications they have, or were supposed to have, are high, "deluxe finishing", as they say, but they were cut back to a great extent. So we must not overlook this experience, and should try to benefit from it, so as not to lose a great deal of effort and money without achieving the desired results.
Among the most prominent negatives of the existing housing: "the small number and cramped size of the rooms in each unit, despite large empty spaces in the plan; also the very close adjacency of the units, especially the bedrooms, which are very near one another, separated only by a wall that does not stop the residents' voices from carrying if they are raised even a little. Even the courtyards do not give each family enough privacy, not to mention the narrowness and small size of the kitchen; how many families have had to enlarge the kitchen by using all or part of the back yard. Nor was any account taken of providing rooms for housemaids and drivers.
Among the points I hope to see in the coming projects are sufficient space for laundry rooms and attention to the size of the ground tank, since in the current housing they are small, and there is weak pressure from the roof tank, which has forced many residents to install a pump to boost the pressure. The planning of the new dwellings must learn from the negatives of the current housing, in the layout and width of streets and the allotment of private parking for each unit, while allowing for the possibility of adding more floors in the future, with attention to how the streets are asphalted so that rainwater drains easily, and care for the landscaping and organization of gardens and children's playgrounds and their maintenance by the municipalities, and the provision of important facilities such as police stations, mosques and schools. Finally, I hope the housing projects will be carried out in record time to help solve the housing crisis; otherwise those projects will be of no use in eliminating the problem.
Read also
- Using Social Media Apps in Education 10 May 2013
- A Project for Cooperation Between Universities and Secondary Schools 7 June 2013
- Housing and Other Things!! 3 May 2013
- Mothers in a World of Loneliness 14 June 2013
- My Teacher Abdulquddus al-Ansari 26 April 2013